1. The adjustment of the shot blasting machine and other equipment, the difference in the projection angle of the steel shot will affect the consumption rate of the steel shot to different degrees. The faster the shot blasting speed, the greater the consumption of the steel shot. Failure to repair in time after damage, failure to take out the mud core bone in the inner cavity of the axle casing before shot blasting, long shot blasting process, failure to seal the top track of the shot blasting machine, and failure to recycle the scattered steel shot in time can affect the utilization of the steel shot. efficiency.
2. The surface roughness of the cleaned material. The higher the roughness, the greater the consumption of steel shot.
3. The amount of sticky sand or the level of rust on the surface of the workpiece to be treated.
4. The hardness of the workpiece is the cleanliness level of the workpiece being cleaned.
5. The arc height requirements of the reinforced work.